Course curriculum

    1. Message From The Director

    2. Session 12 For Plumbers

    3. How To Use This Course

    4. Copyright

    1. Learning Objectives - Section 1 Gasfitting

    2. GAS-2A | Board Updates: e-Licensing

    3. GAS-3A | Board Updates: e-Licensing, continued

    4. GAS-3B | Board Updates: e-Licensing

    5. GAS-4A | Board of Examiners: Record Number Letter

    6. Progress Check: e-Licensing & Record Number Letter

    7. GAS-5A | Proposed Gas Code Changes

    8. GAS-5B | Proposed Gas Code Changes

    9. GAS-6A | Proposed Gas Code Changes, continued

    10. Progress Check: Proposed Gas Code Changes

    11. GAS-7A | Merrimack Valley Gas Incident

    12. GAS-8A | Merrimack Valley Gas Incident, continued

    13. GAS-8B | Merrimack Valley Gas Incident, continued

    14. Progress Check: Merrimack Valley Gas Incident

    15. Section 1 GAS Completed

    1. Learning Objectives - Section 2 Gasfitting

    2. GAS-10A | Size of Chimneys

    3. Progress Check: Size of Chimneys

    4. GAS-12A | Inspection of Chimneys

    5. Progress Check: Inspection of Chimneys

    6. GAS-13A | Affidavits: Chimney Examination Requirement

    7. Progress Check: Affidavits: Chimney Examination Requirement

    8. GAS-14A | Chimney Lining

    9. GAS-15A | Chimney Lining, continued

    10. Progress Check: Chimney Lining

    11. GAS-16A | Common Venting Into an Exterior Masonry Chimney

    12. GAS-18A | Common Venting Into an Interior Masonry Chimney, continued

    13. GAS-19A | Chimney Cleanouts

    14. Progress Check: Chimney Cleanouts

    15. GAS-20A | Space Surrounding Lining or Vent

    16. GAS-21A | Draft Water Heater Venting

    17. Progress Check: Chimney Liners & Draft Water Heater Venting

    18. GAS-22A | Engineered Chimney Venting Systems

    19. Section 2 GAS Completed

    1. Learning Objectives - Section 3 Gasfitting

    2. GAS-24A | Sizing Methods: Gas Piping System

    3. Progress Check: Sizing Methods for Gas Piping Systems

    4. GAS-25A | Sizing Methods: Specific Gravity of Gas

    5. Progress Check: Sizing Methods: Specific Gravity of Gas

    6. GAS-26A | Sizing Methods: Comparison

    7. Progress Check: Sizing Methods: Comparison

    8. GAS-27A | Allowable Pressure Drop

    9. GAS-28A | Pressure Drop and Intended Use

    10. GAS-28B | Pressure Drop and Intended Use, continued

    11. Progress Check: Pressure Drop

    12. GAS-30A | Sizing Exercise: Longest Length Method, Table 6.2(b)

    13. GAS-32A | Sizing Exercise: Longest Length Method, Table 6.2(c)

    14. Progress Check: Longest Length Method, Table 6.2(b)

    15. GAS-34A | Sizing Exercise: Branch Method, Table 6.2(b)

    16. GAS-36A | Sizing Exercise: Branch Method, Table 6.2(c)

    17. Progress Check: Branch Method

    18. GAS-38A | Typical EHD to Pipe Size Conversion Table

    19. Progress Check: EHD to Pipe Size Conversion Table

    20. GAS-39A | Exercise: Longest Length Method, Counterstrike®

    21. Progress Check: Longest Length Method, Counterstrike®

    22. Section 3 GAS Completed

    1. Learning Objectives - Section 4 Gasfitting

    2. GAS-44A | Gas Water Heaters in Bedrooms and Bathrooms

    3. Progress Check: Gas Water Heaters in Bedrooms and Bathrooms

    4. GAS-46A | Boilers & Furnaces in Bedrooms and Bathrooms

    5. Progress Check: Boilers & Furnaces in Bedrooms and Bathrooms

    6. GAS-48A | OSHA: Opioid Awareness

    7. Progress Check: OSHA, Opioid Awareness

    8. Section 4 GAS Completed

    1. Learning Objectives: Section 5 Gasfitting

    2. GAS-51A | Welding of Steel and Wrought Iron Pipe

    3. Progress Check: Welding of Steel and Wrought Iron Pipe

    4. GAS-52A | Gas Piping Systems Over 5,000,000 Btu/hr.

    5. Progress Check: Gas Piping Systems Over 5,000,000 Btu/hr.

    6. GAS-53A | Elevated Pressure

    7. GAS-54A | Elevated Pressure, continued

    8. GAS-55A | Elevated Pressure, continued

    9. GAS-56A | Elevated Pressure, continued

    10. Progress Check: Elevated Pressure

    11. GAS-57A | NFPA-58-2011, Liquified Petroleum Gas Code

    12. Progress Check: NFPA-58-2011, Liquified Petroleum Gas Code

    13. GAS-57A | Dual Fuels Installed in Buildings and Structures

    14. GAS-58A | Dual Fuels Installed in Buildings and Structures, continued

    15. Progress Check: Dual Fuels Installed in Buildings and Structures

    16. GAS Section Completed!

About this course

  • $160.00
  • 162 lessons
  • 0.5 hours of video content