Session 12 ONLINE GASFITTERS Continuing Education
State Board of Examiners of Plumbers and Gasfitters APPROVED 3 Hour Course for GASFITTERS
Message From The Director
Session 12 For Gasfitters
How To Use This Course
Copyright
Learning Objectives - Section 1 Gasfitting
GAS-2A | Board Updates: e-Licensing
GAS-3A | Board Updates: e-Licensing, continued
GAS-3B | Board Updates: e-Licensing
GAS-4A | Board of Examiners: Record Number Letter
Progress Check: e-Licensing & Record Number Letter
GAS-5A | Proposed Gas Code Changes
GAS-5B | Proposed Gas Code Changes
GAS-6A | Proposed Gas Code Changes, continued
Progress Check: Proposed Gas Code Changes
GAS-7A | Merrimack Valley Gas Incident
GAS-8A | Merrimack Valley Gas Incident, continued
GAS-8B | Merrimack Valley Gas Incident, continued
Progress Check: Merrimack Valley Gas Incident
Section 1 GAS Completed
Learning Objectives - Section 2 Gasfitting
GAS-10A | Size of Chimneys
Progress Check: Size of Chimneys
GAS-12A | Inspection of Chimneys
Progress Check: Inspection of Chimneys
GAS-13A | Affidavits: Chimney Examination Requirement
Progress Check: Affidavits: Chimney Examination Requirement
GAS-14A | Chimney Lining
GAS-15A | Chimney Lining, continued
Progress Check: Chimney Lining
GAS-16A | Common Venting Into an Exterior Masonry Chimney
GAS-18A | Common Venting Into an Interior Masonry Chimney, continued
GAS-19A | Chimney Cleanouts
Progress Check: Chimney Cleanouts
GAS-20A | Space Surrounding Lining or Vent
GAS-21A | Draft Water Heater Venting
Progress Check: Chimney Liners & Draft Water Heater Venting
GAS-22A | Engineered Chimney Venting Systems
Section 2 GAS Completed
Learning Objectives - Section 3 Gasfitting
GAS-24A | Sizing Methods: Gas Piping System
Progress Check: Sizing Methods for Gas Piping Systems
GAS-25A | Sizing Methods: Specific Gravity of Gas
Progress Check: Sizing Methods: Specific Gravity of Gas
GAS-26A | Sizing Methods: Comparison
Progress Check: Sizing Methods: Comparison
GAS-27A | Allowable Pressure Drop
GAS-28A | Pressure Drop and Intended Use
GAS-28B | Pressure Drop and Intended Use, continued
Progress Check: Pressure Drop
GAS-30A | Sizing Exercise: Longest Length Method, Table 6.2(b)
GAS-32A | Sizing Exercise: Longest Length Method, Table 6.2(c)
Progress Check: Longest Length Method, Table 6.2(b)
GAS-34A | Sizing Exercise: Branch Method, Table 6.2(b)
GAS-36A | Sizing Exercise: Branch Method, Table 6.2(c)
Progress Check: Branch Method
GAS-38A | Typical EHD to Pipe Size Conversion Table
Progress Check: EHD to Pipe Size Conversion Table
GAS-39A | Exercise: Longest Length Method, Counterstrike®
Progress Check: Longest Length Method, Counterstrike®
Section 3 GAS Completed
Learning Objectives - Section 4 Gasfitting
GAS-44A | Gas Water Heaters in Bedrooms and Bathrooms
Progress Check: Gas Water Heaters in Bedrooms and Bathrooms
GAS-46A | Boilers & Furnaces in Bedrooms and Bathrooms
Progress Check: Boilers & Furnaces in Bedrooms and Bathrooms
GAS-48A | OSHA: Opioid Awareness
Progress Check: OSHA, Opioid Awareness
Section 4 GAS Completed
Learning Objectives: Section 5 Gasfitting
GAS-51A | Welding of Steel and Wrought Iron Pipe
Progress Check: Welding of Steel and Wrought Iron Pipe
GAS-52A | Gas Piping Systems Over 5,000,000 Btu/hr.
Progress Check: Gas Piping Systems Over 5,000,000 Btu/hr.
GAS-53A | Elevated Pressure
GAS-54A | Elevated Pressure, continued
GAS-55A | Elevated Pressure, continued
GAS-56A | Elevated Pressure, continued
Progress Check: Elevated Pressure
GAS-57A | NFPA-58-2011, Liquified Petroleum Gas Code
Progress Check: NFPA-58-2011, Liquified Petroleum Gas Code
GAS-57A | Dual Fuels Installed in Buildings and Structures
GAS-58A | Dual Fuels Installed in Buildings and Structures, continued
Progress Check: Dual Fuels Installed in Buildings and Structures
GAS Section Completed!